Marked EV charging bays in a workplace car park

Areas covered

EV charge point installers, Kent

Commercial EV charging points across Kent

The logistics county, and charging that has to fit around freight.

Kent, in brief

The freight county

Kent is the freight county. The M20 and M2 carry traffic to the Channel ports and the tunnel, and the commercial property along those corridors is weighted heavily towards distribution, storage and everything that supports it.

That makes Kent's charging work different from Surrey's. There are more yards and fewer office car parks, more vans and HGV movements, and a stronger case for depot charging designed around turnaround rather than workplace charging designed around dwell time.

01

Distribution, and what it needs from charging

The estates around Dartford, Aylesford, Ashford and the Medway towns are dominated by storage and distribution. Those sites have large yards, hardstanding rather than landscaped car parks, and vehicle movements that follow delivery schedules rather than office hours.

Charging on a yard is a different install from charging on a car park. Cable routes cross ground that takes heavy vehicle loading, bollard protection matters more, and the units need to survive being worked around rather than parked next to.

  • Yards where cable routes have to survive heavy vehicle loading
  • Bollard protection and heavy duty units rather than slimline wall boxes
  • Turnaround-driven charging rather than dwell-time charging
  • Room for the fleet to grow as more vehicles turn over

02

The grid picture in Kent

UK Power Networks operates across the whole county through its South Eastern network, so unlike Surrey and West Sussex there is no boundary question in Kent. That makes the connection process more predictable, though it does not make capacity any easier to come by on a large site.

Where a depot wants rapid charging, the connection is usually the long pole in the programme rather than the equipment. We establish what the site can get before anything is specified, because the lead time on an application sets the timetable for the whole job.

03

Kings Hill, Ebbsfleet and the office stock

Kent is not only distribution. Kings Hill near West Malling, the growth around Ebbsfleet, and the office stock in Maidstone, Canterbury and Tunbridge Wells give the county a real workplace charging market as well.

Those sites are the more familiar problem: surface car parks, long dwell times, and staff who want to arrive with a low battery and leave full. More bays at a modest rate beats fewer fast ones almost every time.

04

Coastal and rural Kent

Away from the motorway corridors, Kent has a lot of small commercial premises in market towns and villages, and a genuine rural network where supplies are weaker and three phase is not a given. On those sites the first question is what the incoming supply actually is, because it changes what is possible far more than the choice of unit does.

05

Home charging in Kent

Kent's housing runs from Victorian terraces in the Medway towns and the coastal resorts through substantial interwar and post-war suburban stock to a large amount of recent development around Ashford and Ebbsfleet. The newer estates are the most straightforward. Oast conversions and listed rural property need the most thought about where equipment goes and how it is finished.

06

The three sites we are asked about most in Kent

The first is a distribution yard off the M20 or M2 with vans returning in the evening and leaving early. The duty cycle decides everything: how much energy has to go into the fleet overnight, and how wide the window is.

The second is an office or business park site around Kings Hill, Maidstone or Ebbsfleet, which is the more familiar long-dwell workplace problem and usually the easiest to solve well.

The third is a rural or market town premises where the incoming supply is weaker than expected and three phase cannot be assumed. On those the survey is doing real work rather than confirming what everyone already knew.

An industrial unit with marked EV charging bays
Kent is the logistics county. Charging here has to fit around freight movements rather than office hours.

Towns we cover

Across Kent

We cover the whole county, from the Dartford crossing down to the coast.

14 of 14 Kent locations

  • MaidstoneME14
  • AshfordTN23
  • CanterburyCT1
  • DartfordDA1
  • GravesendDA11
  • RochesterME1
  • ChathamME4
  • Tunbridge WellsTN1
  • SevenoaksTN13
  • FolkestoneCT20
  • DoverCT16
  • TonbridgeTN9
  • West MallingME19
  • SittingbourneME10

Questions

What Kent sites ask us

UK Power Networks, through its South Eastern network, across the whole county. Unlike Surrey and West Sussex there is no boundary question in Kent, which makes the connection process more predictable.

Yes. Cable routes have to survive heavy vehicle loading, the units need proper bollard protection, and the charging is driven by turnaround rather than dwell time. It is a different specification from an office car park.

The equipment is rarely the long pole. Where a new or upgraded connection is needed, the application to UK Power Networks usually sets the programme for the whole job, so we establish what the site can get before anything is specified.

Often, but the first question is what the incoming supply actually is, because on rural sites three phase is not a given. That changes what is possible far more than the choice of unit does, so we establish it at survey.

Yes, the whole county, including Medway, Thanet, Folkestone and Dover as well as the M20 and M2 corridors.

Where the supply and the yard allow it, yes, and it is a rapid DC job rather than an AC one. The constraint is almost always the connection rather than the equipment, so that is where we start.

Tell us about the site in Kent

Send over the address and roughly what you are after. We will tell you what it involves and what it costs, with no obligation.